Phinney's Harbor
Phinney's Harbor
A designated Natural Resource Nitrogen Sensitive Area covering Bourne.
What each town filed
| Town | Filing | Transmittal |
|---|---|---|
| Bourne | Notice of Intent | 25-WP94-0001-APP |
What the filings mean
Notice of Intent
The town has filed a Notice of Intent: a commitment to apply for a Watershed Permit later, on a schedule approved by MassDEP. It pauses the clock. It does not stop it.
Because these are applications rather than granted permits, the suspension is conditional. A town that misses the milestones in its approved schedule can have the five-year upgrade clock started by MassDEP — running to 8 July 2030.
MassDEP's reports for this area
The studies behind this area, published by MassDEP.
- Phinneys Harbor, Eel Pond, & Back River System, Bourne MA - 2006 (2006) — Massachusetts Estuaries Project report
- Phinneys Harbor Embayment System TMDLs For Nitrogen (Total) (2008) — Total Maximum Daily Load report CN 247.0
Selling a property here
On the MassDEP nitrogen disclosure form, a seller in Phinney's Harbor would normally tick box 2 — located in a Nitrogen Sensitive Area, but not subject to the upgrade requirement because a filing covers the watershed — and name the filing for their town above.
Separately, a passing Title 5 inspection is required before transfer, as it is everywhere in Massachusetts. How the disclosure works →
Filings: MassDEP watershed application table, 11 June 2026. Map name transcribed from MassDEP's NSA Address Lookup Map, 10 August 2026. Reports: MassDEP Natural Resource Nitrogen Sensitive Areas feature layer, retrieved 26 August 2026.
Get a Title 5 inspection quote
Tell us the property and what you need. We pass the request to licensed Title 5 system inspectors covering that town. Free, and there is nothing to sign here.