Designated 2023-07-07
Chatham
Chatham has one of the Cape's few municipal wastewater treatment facilities and an extensive sewer programme, so a smaller share of properties rely on septic systems than elsewhere.
What Chatham filed
| Watershed | Filing | Transmittal | MassDEP's map calls it |
|---|---|---|---|
| Pleasant Bay | Permit granted | Permit 01-M1 | Pleasant Bay System |
| Taylors Pond / Mill Creek | Notice of Intent | 23-WP94-0010-APP | Stage Harbor/Oyster Pond, Sulphur Springs/Bucks Creek, and Taylors Pond/Mill Creek Embayment Systems |
| Sulfur Springs / Bucks Creek | Notice of Intent | 23-WP94-0010-APP | Stage Harbor/Oyster Pond, Sulphur Springs/Bucks Creek, and Taylors Pond/Mill Creek Embayment Systems |
| Stage Harbor | Notice of Intent | 23-WP94-0010-APP | Stage Harbor/Oyster Pond, Sulphur Springs/Bucks Creek, and Taylors Pond/Mill Creek Embayment Systems |
MassDEP's address map draws these 4 rows as 2 areas — it groups some of them and uses longer names. Match on the opening words.
What that means if you are selling
Every designated watershed Chatham appears in is covered by a filing, so the nitrogen upgrade requirement is suspended in all of them. On the MassDEP disclosure form a seller in one of those would normally tick box 2 — in a Nitrogen Sensitive Area, not currently subject to an upgrade — and name the filing above.
Start from the map, not from this table. Look the address up on MassDEP's address map, read the Estuarine System Name in the popup, and put that name into the check tool. If the map shows no shaded area at the property, box 4 applies.
If Chatham were to miss the milestones in its approved schedule, MassDEP could start the five-year upgrade clock, which would run to 8 July 2030. That has not happened. It is the reason this page carries a date and gets re-checked.
Watersheds shared with other towns
These cross town lines, and the neighbouring town did not always file the same way — so two properties in the same watershed can sit in different positions.
- Pleasant Bay — also Brewster (Permit granted), Harwich (Permit granted), Orleans (Permit granted)
A property sitting near a watershed boundary can return two names from a single click on MassDEP's map, each a real watershed. Run the check once for each. If the two give different answers, Chatham Board of Health decides which one the property is in.
The requirement that applies either way
A passing Title 5 inspection is required before you transfer title in Massachusetts. For an ordinary sale it must be done at or within two years before the transfer — or up to three years before, if the report comes with pumping records showing the system was pumped at least once a year since (310 CMR 15.301(1)). Some transfers run on their own timetables under 15.301(3), and refinancing or adding a spouse is not a transfer at all under 15.301(2). That is independent of anything on this page.
Your septic records
Chatham Board of Health holds septic records and Title 5 reports. If you are trying to establish that nitrogen-reducing technology was already installed — box 3 on the disclosure form — that installation date is what you need, and the Board of Health file is where it lives.
Filings from MassDEP watershed application table, 11 June 2026. Map names transcribed from MassDEP's NSA Address Lookup Map, 10 August 2026.
Get a Title 5 inspection quote
Tell us the property and what you need. We pass the request to licensed Title 5 system inspectors covering Chatham.